Pelican Point Power Station

Employer
McConnell Dowell
Period
2000
Location
Adelaide
The 480MW Pelican Point Combined Cycle Power Station involved the construction of all piled foundations, concrete works, buildings, drainage, switchyard preparation, earth dams, marine outfall/intake, internal/external roads, and landscaping. Additional works were added into the scope such as the cooling water system, the ocean intake/outfall, dredging works, and boat ramp due to the great performance of the team.

Ready to partner with IPDM?